Downtime Starts Underground.
Texas is building data centers faster than anywhere in America, and every campus depends on what gets buried first: redundant feeds, duct banks, fiber routes, and cooling infrastructure. A strike during construction is a schedule event. A strike near a live campus is a headline.
A campus buries more utility than a small town
A single hyperscale site carries redundant medium-voltage feeds, generator fuel systems, chilled water or refrigerant loops, dense fiber entrances from multiple providers, and duct banks that make downtown corridors look sparse. It all goes in fast, phase by phase, with multiple contractors trenching the same corridors months apart.
The corridors around campuses matter as much as the sites: fiber routes and power feeds approach from miles away, crossing farmland, easements, and other projects' work.
- Redundant feeds where a single strike defeats the design
- Duct banks trenched by different contractors across phases
- Multiple provider fiber entrances converging on one site
- Fuel and cooling systems with tight clearance requirements
- Approach corridors crossing legacy rural service
Redundancy on paper means nothing if both feeds share a trench nobody mapped.

From Greenfield to Live-Campus Adjacent
Different phases carry different risks. The locating scope should match.
Site Development
Pre-construction locating across the parcel, including the farm-era and legacy service greenfield land tends to hide.
Learn more →Between Phases
As-installed verification and conflict screening before each new trench crosses what earlier phases buried.
Learn more →Live-Adjacent Work
Verified locates and measured test holes where excavation approaches energized feeds and active fiber.
Learn more →An outage traced to a dig is a career-ending root cause.
Verified locates and measured clearances are the cheapest line in the entire project budget.
Send the Address & ScopeData Center Questions
Can you keep up with a fast-track construction schedule?
Do you document what you find for the record set?
Can you screen approach corridors, not just the site?
How do you handle work near energized redundant feeds?
Do you work in the major Texas data center corridors?
What about existing campuses adding capacity?
Breaking ground on a campus or corridor?
Send the site, the phase, and the schedule. We will come back with a locating plan that keeps pace.
Ready to protect the schedule?
Send the project location, phase, and access requirements. We will scope pre-construction, phase-gap, or live-adjacent locating to match.