For Data Center Construction

Downtime Starts Underground.

Texas is building data centers faster than anywhere in America, and every campus depends on what gets buried first: redundant feeds, duct banks, fiber routes, and cooling infrastructure. A strike during construction is a schedule event. A strike near a live campus is a headline.

Crew running a locate across marked ground on a large construction site
Redundancy Is BuriedBoth feeds are underground, and so is the risk
Duct BanksLocated before the next trench
Fiber RoutesScreened before boring
VerifiedTest holes at critical crossings
Same-day or next-day mobilization
PDF maps & KMZ deliverables included
Private utility locating beyond 811 coverage
The Density Problem

A campus buries more utility than a small town

A single hyperscale site carries redundant medium-voltage feeds, generator fuel systems, chilled water or refrigerant loops, dense fiber entrances from multiple providers, and duct banks that make downtown corridors look sparse. It all goes in fast, phase by phase, with multiple contractors trenching the same corridors months apart.

The corridors around campuses matter as much as the sites: fiber routes and power feeds approach from miles away, crossing farmland, easements, and other projects' work.

  • Redundant feeds where a single strike defeats the design
  • Duct banks trenched by different contractors across phases
  • Multiple provider fiber entrances converging on one site
  • Fuel and cooling systems with tight clearance requirements
  • Approach corridors crossing legacy rural service

Redundancy on paper means nothing if both feeds share a trench nobody mapped.

GPR cart scanning a corridor on an industrial construction project
Where We Fit

From Greenfield to Live-Campus Adjacent

Different phases carry different risks. The locating scope should match.

Site Development

Pre-construction locating across the parcel, including the farm-era and legacy service greenfield land tends to hide.

Learn more →

Between Phases

As-installed verification and conflict screening before each new trench crosses what earlier phases buried.

Learn more →

Live-Adjacent Work

Verified locates and measured test holes where excavation approaches energized feeds and active fiber.

Learn more →
The Stakes

An outage traced to a dig is a career-ending root cause.

Verified locates and measured clearances are the cheapest line in the entire project budget.

Send the Address & Scope
EM+GPR
Dual-method locating on every scope
PDF/KMZ
Maps & GPS data included
5 Metros
Austin, Dallas, Houston, Fort Worth, San Antonio
5.0★
Average Google review rating
Common Questions

Data Center Questions

Can you keep up with a fast-track construction schedule?
Yes. Phase-gap locating is the model: we verify between trades so the schedule keeps moving, with same-day or next-day mobilization typical across the Texas corridors where campuses are being built.
Do you document what you find for the record set?
Every locate delivers PDF and KMZ mapping with GPS positions, which is exactly the layer fast-moving projects lose between contractors. Many teams treat our maps as the running utility record across phases.
Can you screen approach corridors, not just the site?
Yes. Fiber and power approach routes cross miles of mixed ground, and corridor screening before boring is a standard scope.
How do you handle work near energized redundant feeds?
Verified locating plus vacuum excavated test holes at every crossing that matters. Estimated clearance next to a live feed is not clearance.
Do you work in the major Texas data center corridors?
Yes: the San Antonio and Austin metro corridors, northeast Travis County, DFW, and project mobilization statewide.
What about existing campuses adding capacity?
Expansion work beside live infrastructure is the highest-stakes version of this job, and exactly where measured verification replaces assumptions.

Breaking ground on a campus or corridor?

Send the site, the phase, and the schedule. We will come back with a locating plan that keeps pace.

Send the Address & Scope
Get in Touch

Ready to protect the schedule?

Send the project location, phase, and access requirements. We will scope pre-construction, phase-gap, or live-adjacent locating to match.

Texas-wide project mobilization
Phase-gap and corridor screening
PDF, KMZ, and coordinate deliverables